Monday, April 18, 2011
unstuck
#1 buyer came unstuck 4/9. with a fairly lame excuse about location too far from her work. i don't think you put a house under contract without thinking location through.
being the sucker that i am, i had waived earnest money. she was clearly strapped for cash, single mom. as a courtesy i did, hoping the great score keeper in the ether would return good karma to me.
so i lost a weekend of showings with it 'pending' on her whim. and got paid $150.
option periods are a bad idea. it puts the seller at the mercy of flaky lookers. they don't have to commit. they can tie up multiple properties and take 7 - 10 days to walk away without consequence. maybe they lose their earnest and option monies.
when i bought the schoolhouse, i optioned for 4 days, only because a weekend was involved. and added "or sooner" to the contract. all i needed was the inspection to come back saying it wasn't falling down. i was committed from the minute i made the offer.
wish we had canada's laws. they don't let buyers play house like this.
being the sucker that i am, i had waived earnest money. she was clearly strapped for cash, single mom. as a courtesy i did, hoping the great score keeper in the ether would return good karma to me.
so i lost a weekend of showings with it 'pending' on her whim. and got paid $150.
option periods are a bad idea. it puts the seller at the mercy of flaky lookers. they don't have to commit. they can tie up multiple properties and take 7 - 10 days to walk away without consequence. maybe they lose their earnest and option monies.
when i bought the schoolhouse, i optioned for 4 days, only because a weekend was involved. and added "or sooner" to the contract. all i needed was the inspection to come back saying it wasn't falling down. i was committed from the minute i made the offer.
wish we had canada's laws. they don't let buyers play house like this.
Saturday, April 9, 2011
Sunday, April 3, 2011
Friday, March 25, 2011
Monday, March 7, 2011
blasted plumbing
schoolhouse bathroom is a hack job. escutcheons missing, loose, not caulked. spigot piped through the overflow opening. no overflow. shower diverter seized from calcium deposits. stuck in shower mode. single knob mixer doesn't control volume, just full on. pressure is enough to peel skin off and splash water to the 11 foot ceiling.
then something changed. pressure went to a drip. time to excavate.
cartridge valve check. bad gasket check.
put back together. next try to unsieze diverter.

cookie sheets, pot lid come in handy to shield work area. wet towel might help.

get it hot and smack it around, brace the unsecured copper pipe.

ta-da. bathtime.

project for another day. the aqua tile is gorgeous. iridescent. broken bits make me sad. pinwheel tile on the floor is in great shape. needs a zep treatment to bring back the white grout.

this was all a temporary fix just to use the shower. the surround is cracked, offset, separating. not salvagable.
shower surround will be gutted, galvanized pipe replaced with copper, overflow installed, and proper hardware installed. keeping the tub, floor tile, and the tile wainscot in the rest of the room. have to somehow cut a clean stopping point in the wainscot and match the mud set depth. we'll see.
then something changed. pressure went to a drip. time to excavate.
cartridge valve check. bad gasket check.
put back together. next try to unsieze diverter.
cookie sheets, pot lid come in handy to shield work area. wet towel might help.
get it hot and smack it around, brace the unsecured copper pipe.
ta-da. bathtime.
project for another day. the aqua tile is gorgeous. iridescent. broken bits make me sad. pinwheel tile on the floor is in great shape. needs a zep treatment to bring back the white grout.
this was all a temporary fix just to use the shower. the surround is cracked, offset, separating. not salvagable.
shower surround will be gutted, galvanized pipe replaced with copper, overflow installed, and proper hardware installed. keeping the tub, floor tile, and the tile wainscot in the rest of the room. have to somehow cut a clean stopping point in the wainscot and match the mud set depth. we'll see.
plas-teek
remember that cold snap?
thermostat set to 55, furnace won't cycle off. outside temp 20s and dropping. inside temp 50s and dropping. panic ensues.
5 stores later, found a space heater at costco. saved 50 bucks compliments of alvin's member card. slept with heater pointed at my head. next day fred helped blow in 12" insulation. he and kim put plastic over windows. maintained house at chilly 55.
warm weather arrived. pulled plastic down. pried staples from 100 year old trim wood. 1 staple nailed every 3-5 inches on 80"h x 120"w windows = a patch and paint project for another time.
cat included for scale.
Sunday, February 27, 2011
Tuesday, February 8, 2011
schoolhouse
Friday, December 10, 2010
Sunday, November 21, 2010
Tuesday, November 2, 2010
Sunday, October 31, 2010
Wednesday, October 20, 2010
Saturday, September 11, 2010
land of exceptionally boring food
Subscribe to:
Posts (Atom)








